Carrothers House Restoration - 2008

We took a summer off, so to speak. No big projects, just catching up on little things. Redid a bathroom, stripped and refinished lots of moulding, made rosettes, installed a basement sump pump with dual ejection piping, installed basement electric subpanel, installed electric water heater for wood fired preheated water, finished kitchen and pantry, stripped and refinished the main entrance door, and made 45 gallons of beer. It was a light year.

Home